Ignition contacted us to provide a temporary structure at Goodwood Festival of Speed for Vauxhall.
The Vision
A large, inviting double storey temporary event structure with an open feel.
We Delivered
A 6M X 12M double storey temporary structure with domed roof
Logistical planning ensuring the entire kit was shipped and delivered on-time.
This temporary structure took 4 days to build.