The Vision
TPN contracted us to provide a unique structure for JCB at INTERMAT in Paris.
We Delivered
A central triple storey atrium with walkway with a double storey structure either side of the atrium with balcony.
Logistical planning ensuring the entire kit was shipped and delivered on-time.
This temporary structure took 3 weeks to build.