Feldon Valley Golf Course Temporary Club House

Feldon Valley Golf Course Temporary Club House

Worldwide Structures supplied a semi-permanent 15M X 17.5M single decked structure with architectural glazing to 2 sides of the building offering stunning views across the course and the rolling Cotswold Hills. Incorporated within the building: a restaurant and a bar also with superb views, full catering kitchen, fully stocked Golf Pro shop, changing rooms and toilets. As well as the main building all services were undertaken including moving the buggy charging station. A secure storage facility was also provided linked to the main structure

The Vision

In 2013 Feldon Valley, a 6,230 yard Par 71 challenging golf course situated in the beautiful North Cotswolds was taken over by new owners.

Since the takeover it has continued to undergo major works on the course in-order to bring the greens and fairways into the pristine condition expected of a premium course.

In keeping with the £6.9 million redevelopment the next stage was to build an onsite hotel with lodges set into the landscape, plus totally redevelop the member’s clubhouse.

We were approached to assist with the clubhouse by providing a semi-permanent structure in order to keep the course operational whilst the old club house was dismantled, and the new club house built.

 The System

We supplied a 15M X 17.5M single decked structure with architectural glazing to 2 sides of the building offering stunning views across the course and the rolling Cotswold Hills.

Incorporated within the building are: restaurant and bar also with superb views, full catering kitchen, fully stocked Golf Pro shop, changing rooms and toilets.

As well as the main building all services were undertaken including moving the buggy charging station. A secure storage facility was also provided linked to the main structure.

In addition to the structure we also supplied and installed the carpets, vinyl, electrics, telephone wiring, interior décor, lighting, heating, water and waste. To ensure the whole installation was done on time and to our excellent standard we appointed one of our dedicated project managers to be present throughout the build and fit out.

 

 

 Worldwide Structures Ltd Delivered

• A 15M X 17.5M single decked structure with architectural glazing to 2 sides of the building.

• Timing was a major factor in choosing Worldwide Structures. From starting the building to it being fully operational was only a remarkable 7 days! This included moving the existing catering equipment and commissioning. We are pleased to say the kitchen was providing a full service 24 hours after leaving the old building.

• With all the works being carried out it was so important to the owners to keep their members happy and business running seamlessly. Mr. Robert Clive the director in charge of the whole project said, ‘How to keep memberships, supply the facilities and maintain the revenue streams from catering, the shop and green fees during such a major development was thought to be a major challenge’ but we provided the whole solution!

 