Fastnet required a large temporary structure to act as their Race Centre in Plymouth for the annual Fastnet Race
The Vision
A large double storey structure with clear views over the harbour to view the race.
The site for this build was really very challenging, with a road on one side and the sea on the other.
We Delivered
A 5M X 20M double storey temporary structure with domed roof.
Logistical planning ensuring the entire kit was shipped and delivered on-time.
This temporary structure took 4 days to build.